| Time Study on Two-Echelon Supply Chain for Steel Framing Construction by Using Networking Simulation Model |
| by Chun-Nen Huang, Yi June Seong and Jeffrey S. Russell |
Paper: Time Study on Two-Echelon Supply Chain - Paper (1 MB) |
Presentation: Time Study on Two-Echelon Supply Chain - Slides (1.1 MB) |
| |
| Improving the Delivery Process for Engineered-To-Order Products - Lessons Learned from Power Distribution Equipment |
| by Jan A. Elfving, Iris D. Tommelein and Glenn Ballard |
Paper: Improving the Delivery Process - Paper (860 KB) |
Presentation: Improving the Delivery Process - Slides (258 KB) |
| |
| Lean Supply Systems in Construction |
| by James Choo, Roberto Arbulu and Glenn Ballard |
Paper: Lean Supply Systems in Construction - Paper (936 KB) |
Presentation: Lean Supply Systems in Construction - Slides (1.7 MB) |
| |
| Application of Lean Supply Chain Concepts to a Vertically-Intergrated Company: A Case Study |
| by Iris D. Tommelein, Nadia G. Akel and J.C. Boyers |
Paper: Application of Lean Supply Chain Concepts - Paper (1 MB) |
Presentation: Application of Lean Supply Chain Concepts - Slides (214 KB) |
| |
| Value Stream Macro Mapping - A Case Study of Aluminium Windows for Construction Supply Chain |
| by Flįvio A. Picchi and Patricia S. P. Fontanini |
Paper: Value Stream Macro Mapping - Paper (658 KB) |
Presentation: Value Stream Macro Mapping - Slides (129 KB) |
| |
| An Analysis of the Life-Cycle Curtain Wall Process through Supply Chain Management |
| by S. Chin, S.W. Yoon, S.O. Jung, Y.S. Kim, C.D. Kim, Y.K. Choi, J.Y. Chun and H.C. Lim |
Paper: An Analysis of the Life-Cycle Curtain Wall Process - Paper (773 KB) |
Presentation: An Analysis of the Life-Cycle Curtain Wall Process - Slides (340 KB) |
| |
| Resource Basins - A Strategic Challenge for the Building Industry |
| by Erik Bejder and Malene Mųller |
Paper: Resource Basins - Paper (787 KB) |
Presentation: Resource Basins - Slides (1016 KB) |