| How to Reduce Batch-Size |
| by Mikkel Andreas Thomassen and Anni Schmidt Nielsen |
| Paper: |
| Presentation: Mikkel Andreas Thomassen did his presentation without slides |
| Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of HVAC Ductwork |
| by Thais da C.L. Alves and Iris D. Tommelein |
| Paper: |
| Presentation: |
| Creating Work Structuring Transparency in Curtain Wall Design |
| by Cynthia Tsao and Iris D. Tommelein |
| Paper: |
| Presentation: |
| The Design of Production Systems for Low-Income Housing Projects |
| by Carlos T. Formoso, Fábio K. Schramm and Dayana B. Costa |
| Paper: |
| Presentation: |
| Reducing Schedule in Repetitive Construction Projects |
| by Luis F. Alarcón and Christian Betanzo and Sven Diethelm |
| Paper: |
| Presentation: |
| Non-Unit Based Planning and Scheduling of Repetitive Construction Projects |
| by Rong-yau Huang and Kuo-Shun Sun |
| Paper: |
| Presentation: |

