Logo: IGLC 2004, link to front pageLogo: IGLC 2004, link to front page
IGLC 2004
  Print Print  Log in Log in  Search Search
You are here: IGLC 2004 > 4 - Buffer Management and Work Structuring

4 - Buffer Management and Work Structuring

How to Reduce Batch-Size
by Mikkel Andreas Thomassen and Anni Schmidt Nielsen
Paper: Download How to Reduce Batch-Size - Paper (1.1 MB) 
Presentation: Mikkel Andreas Thomassen did his presentation without slides
   
Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of HVAC Ductwork
by Thais da C.L. Alves and Iris D. Tommelein
Paper: Download Simulation of Buffering and Batching Practices - Paper (905 KB) 
Presentation: Download Simulation of Buffering and Batching Practices - Slides (296 KB) 
  
Creating Work Structuring Transparency in Curtain Wall Design
by Cynthia Tsao and Iris D. Tommelein 
Paper: Download Creating Work Structuring Transparency - Paper (923 KB) 
Presentation: Download Creating Work Structuring Transparency - Slides (539 KB) 
  
The Design of Production Systems for Low-Income Housing Projects
by Carlos T. Formoso, Fábio K. Schramm and Dayana B. Costa
Paper: Download The Design of Production Systems - Paper (982 KB) 
Presentation: Download The Design of Production Systems - Slides (448 KB) 
  
Reducing Schedule in Repetitive Construction Projects
by Luis F. Alarcón and Christian Betanzo and Sven Diethelm
Paper: Download Reducing Schedule in Repetitive Construction Projects - Paper (1.1 MB) 
Presentation: Download Reducing Schedule in Repetitive Construction Projects - Slides (1 MB) 
  
Non-Unit Based Planning and Scheduling of Repetitive Construction Projects
by Rong-yau Huang and Kuo-Shun Sun
Paper: Download Non-UNIT Based Planning and Scheduling - Paper (685 KB) 
Presentation: Download Non-Unit Based Planning and Scheduling - Slides (420 KB)